Jump to content

Recommended Posts

Posted

Benfold lost power on July 24. It was towed to Subic Bay on July 28. Power was restored two days later with all repairs completed by Aug. 7, Cmdr. Matt Comer, spokesperson for U.S. 7th Fleet previously told USNI News.

During the four days without power, Benfold lost air conditioning, galleys, toilets and showers. Potable water was also affected by the power failure.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...
Forum Home
www.NavyAdvancement.com
Boots | Navy Patches
Serving enlisted, veterans, spouses & family