Jump to content

NAVY RESERVE FISCAL YEAR 2024 (FY-24) ADAPTIVE MOBILIZATION (AM) MANNING OPERATIONAL PLANNING TEAM (OPT) ANNOUNCEMENT


Tony

Recommended Posts

RTTUZYUW RHOIAAA0009 0471909-UUUU--RHSSSUU.
ZNR UUUUU
R 160036Z FEB 24 MID120000893236U
FM COMNAVRESFOR NORFOLK VA
TO NAVRESFOR
COMNAVRESFOR NORFOLK VA
COMNAVRESFORCOM NORFOLK VA
COMUSFLTFORCOM NORFOLK VA
BUMED FALLS CHURCH VA
COMNAVPERSCOM MILLINGTON TN
COMNAVAIRFORES SAN DIEGO CA
COMNAVIFORES FORT WORTH TX
COMNECC LITTLE CREEK VA
COMNAVSPECWARGRU ELEVEN
REDCOM SAN DIEGO CA
REDCOM EVERETT WA
REDCOM GREAT LAKES IL
REDCOM FORT WORTH TX
REDCOM NORFOLK VA
REDCOM JACKSONVILLE FL
MDSC NORFOLK VA
COMFLELOGSUPPWING FORT WORTH TX
VAQRON TWO ZERO NINE
COMNAVELSG WILLIAMSBURG VA
MESG ONE
MESG TWO
NAVCONSTGRU ONE PORT HUENEME CA
NAVCONSTGRU TWO GULFPORT MS
SEAL TEAM SEVENTEEN
SEAL TEAM EIGHTEEN
TSC NORFOLK VA
INFO CNO WASHINGTON DC
CNIC WASHINGTON DC
NAVPAYPERS SUPPORT CTR MILLINGTON TN
BT
UNCLAS
ALNAVRESFOR 006/24
MSGID/GENADMIN/COMNAVRESFOR NORFOLK VA/N3/FEB//
SUBJ/NAVY RESERVE FISCAL YEAR 2024 (FY-24) ADAPTIVE
MOBILIZATION (AM) MANNING OPERATIONAL PLANNING TEAM (OPT)
ANNOUNCEMENT//
REF/A/DOC/CJCS/01DEC20//
REF/B/DOC/CNO WASHINGTON DC/MAY21//
NARR/REF A IS JOINT PUBLICATION 5-0, JOINT PLANNING. REF B IS NAVY
WARFARE PUBLICTION 5-01, NAVY PLANNING.//
RMKS/1. SITUATION. Over the last two years of implementing adaptive
mobilization (AM) to fulfill steady state activation requirements,
Commander, Navy Reserve Force (CNRF) has identified barriers to the
execution of the mass activation capabilities of AM. A major barrier
to the success of AM is manning wholeness.
2. BACKGROUND.
 2.A In October and November of 2023 an operational planning
team (OPT) was stood up to perform mission analysis, course of
action (COA) development, and COA analysis/comparison via a table
top exercise (TTX). During that TTX a number of barriers to success
were identified including manning wholeness in support of AM.
 2.B Over the past two years significant efforts to distribute
mobilization processing have been underway. The most notable result
of these efforts is the Navy's expansion from a single Navy
Mobilization Processing site (NMPS)to now 16 NMPSs distributed
across the continental United States. The establishment of multiple
NMPSs has resulted in increased mobilization processing throughput
capacity and provided redundancy to the Navy's ability to mobilize
Sailors for Individual Augmentee (IA) steady-state requirements.
 2.C The expansion from a single NMPS to 16 NMPSs brings with it a
need to evaluate manning associated with echelon-respective AM
processes. The actions prescribed in this PLANORD will ensure
alignment in planning and fulfillment of these manning needs
utilizing the processes outlined in reference (a) and reference (b)
to:
 2.C.i. Ensure a common understanding of the situation regarding
manning needs and requirements for headquarters, supporting
commanders, adaptive mobilization readiness teams (AMRTs) and
mobilization processing teams (MPTs).
 2.C.ii. Historical analysis of NMPS throughput.
 2.C.iii. Determination of manpower requirements to perform
steady-state mobilization and demobilization processing.
 2.C.iv. Review of steady state manpower requirements to ensure
support of a scalable mobilization process i.e. ability to execute
mass-activation.
3. SCHEDULE.
 3.A. FY-24 AM Manning Mission Analysis and Course of Action
Development.
 3.A.i. CNRF will coordinate and stand up an OPT in order to
execute analysis and COA development and analysis/comparison phases
of the Navy planning process ISO manning of adaptive mobilization
readiness teams and mobilization processing teams on or
about 5-6 March 2024. This OPT will be held in-person in Norfolk, VA
at the Joint Expeditionary Base - Little Creek library and will
include up to two members from each Echelon II/III/IV stakeholders.
 3.A.ii. The OPT will utilize processes of reference (a) and
reference (b) to validate and update all manning analyses performed
and to develop courses of action to identify barriers to appropriate
manning fulfillment and application.
4. TASKS
 4.A. CNRF will plan, coordinate, and execute, the event described
in paragraph 3. Attendance will be coordinated with attending
stakeholders via separate correspondence.
 4.B. Supporting commanders designated representative will
participate in these events, in-person, and participate as subject
matter experts (SMEs). These SMEs should be associated with
manpower (N1) and AM processing (N3/N5). Enlisted SME attendance is
highly encouraged.
 4.C. For these events, objectives include the following tasks:
 4.C.i. Review previous AM manning plans including mission and
intent, purpose, externally imposed limitations, and facts and
assumptions.
 4.C.ii. Validate/update previous facts and assumptions, staff
estimates, risk assessments, and decision tools.
 4.C.iii. Identify resource shortfalls.
 4.C.iv. Ensure that if resourced properly for steady-state
activations, these processes are scalable at determined staff levels
to support mass-activation.
5. ADMINISTRATION AND LOGISTICS. This directive does not appropriate
funds. Conduct events on a not-to-interfere basis with real-world
operations and mobilizations.
6. COMMAND AND CONTROL
 6.A. Supported Command
 6.A.i. Commander, Navy Reserve Force
 6.B. Supporting Commands
 6.B.i. Commander, United States Fleet Forces Command
 6.B.ii. Commander, Bureau of Medicine and Surgery
 6.B.iii. Commander, Navy Personnel Command
 6.B.iv. Commander, Navy Reserve Forces Command
 6.B.v. Commander, Navy Air Force Reserve
 6.B.vi. Commander, Naval Information Force Reserve
 6.B.vii. Commander, Navy Expeditionary Combat Command
 6.B.viii. Commander, Naval Special Warfare Group 11
 6.B.ix. Navy Mobilization Processing Sites
7. POINTS OF CONTACT
 7.A. CDR Andrew Alvarado, CNRF N36, lacmob(at)us.navy.mil//
8. Released by RADM M.J. Steffen, Deputy Commander, Navy
Reserve Force.//
BT
#0009
NNNN

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • 🧧 Activity Stream

    1. 0

      Years Later, VA Still Has Still Not Fulfilled Promise to Cover Gender-Affirming Care

    2. 0

      Pentagon advised to get better handle on chronic lack of sleep in services

    3. 0

      FY-25 ACTIVE-DUTY NAVY NUCLEAR LIMITED DUTY OFFICER IN-SERVICE PROCUREMENT SELECTION BOARD RESULTS

×
×
  • Create New...
Forum Home
www.NavyAdvancement.com
Boots | Navy Patches
Serving enlisted, veterans, spouses & family