Jump to content
Forum | Advancement | Career | Veteran

Sign in to follow this  
Tony

How the problems on the US Navy's new supercarrier helped them build the next one cheaper and faster

Rate this topic

Recommended Posts

Tony

Days after the first-in-class aircraft carrier USS Gerald R. Ford sailed out of a "challenging" post-shakedown work period that was extended three months because of maintenance problems, the dry dock holding the second Ford-class carrier, the John F. Kennedy, was flooded, launching the carrier three months early. https://www.businessinsider.com/how-problems-with-carrier-ford-helped-navy-build-carrier-kennedy-2019-11

Share this post


Link to post
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

  • Who's Online   0 Members, 0 Anonymous, 19 Guests (See full list)

    There are no registered users currently online



×
×
  • Create New...