Jump to content
Navy Forum for Enlisted, Reserves, Veterans, Chiefs & Spouses

How the problems on the US Navy's new supercarrier helped them build the next one cheaper and faster

Rate this topic


Recommended Posts

Days after the first-in-class aircraft carrier USS Gerald R. Ford sailed out of a "challenging" post-shakedown work period that was extended three months because of maintenance problems, the dry dock holding the second Ford-class carrier, the John F. Kennedy, was flooded, launching the carrier three months early. https://www.businessinsider.com/how-problems-with-carrier-ford-helped-navy-build-carrier-kennedy-2019-11

Link to comment
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Who's Online   0 Members, 0 Anonymous, 17 Guests (See full list)

    There are no registered users currently online

×
×
  • Create New...